<dd id="kfpmr"><noscript id="kfpmr"></noscript></dd>

  1. <em id="kfpmr"></em>
    <button id="kfpmr"><acronym id="kfpmr"></acronym></button><dd id="kfpmr"><noscript id="kfpmr"><video id="kfpmr"></video></noscript></dd>

      <button id="kfpmr"><acronym id="kfpmr"></acronym></button>

      <em id="kfpmr"></em>

      1. <li id="kfpmr"></li><tbody id="kfpmr"></tbody>

            <em id="kfpmr"><acronym id="kfpmr"><input id="kfpmr"></input></acronym></em>
          1. The water cooling room

            new time:2015/3/6 14:11:42

            Function description: The water cooling room includes framework,water pipe, spray pipes,steel window(Can be specified materials),exhaust fans and air duct,etc. To meet the FBE/3PE production requirements. Steel pipes need to go through IF heating device to heat to a specified temperature(FBE powder gelling temperature,AD/PE material for bonding temperature,to prevent the rapid contraction because of the temperature difference when extrusion).After the pipe complete winding,they go into water cooling room, the coating layer and the pipe is cooled by cooling water(The pipe’s temperature is less than 60℃ at the pipe out area). To make sure no damage happened to the PE layer during the operation.

             

            Photos on site

             

            3-Dimensional

            Each decomposition figure

             

            Technical Parameter

            S.N,

            Name

            Technical Parameter

            1

            Exhaust fan

            2.2kW

            2

            Height

            Adjust according to the pipe OD

             

            contact

            Langfang Dingsheng Mechanical Equipment Co., Ltd

            Tel:86-0316-2207771

            86-0316-2207773

            Tel:18831688900

            Fax:86-0316-2231218

            E-mail:dshjx@vip.sina.com

            Add:NO. 198, AI'MIN ST. EAST, LANGFANG,HEBEI, CHINA

             

            国产亚洲精品福利视频-最新国产精品精品视频,午夜性色福利在线视频-高清国产午夜福利在线视频-天天操夜夜操